 |
Tubau-Belaga Access Road
|
 |
Miri-Bintulu Trunk Road (64km)
|
 |
Kalaka-Saribas IADP Access Roads
|
 |
Samarahan Farm Roads
|
 |
Ulu Sekabai/Sg Kelebu Road Tatau, Package A (25km)
|
 |
Bakun Access Road (84km Tubau-Bakun Dam section)
|
 |
Bako Causeway across Sg Santubong
|
 |
Sg Besi Road, Kuala Lumpur
|
 |
Upland Gyratory Interchange, Kuching
|
 |
Lundu Sempadi Coastal Road, Kuching (16km)
|
 |
Jalan Song - Jalan Stutong Link Road, Kuching (1km)
|
 |
Jalan Ulu Sibau/Ng. Antaroh, Kapit Division (21km)
|
 |
Miri-Marudi Feeder Road, Miri (40km)
|
 |
Jalan Kelait - Entanggor, Samarahan Division (20km)
|
 |
Approach Roads to Batang Rajang Bridge at Durin (12km)
|
 |
Proposed Road to Betong Town Extension, Betong Division (7km)
|
 |
Sg Sarawak Causeway for Sg Sarawak Regulation Scheme, Kuching
|
 |
Jalan Matu/Igan/Oya - Seksyen Igan/Oya, Mukah Division (16km)
|
 |
Upgrading of Betong-Kayu Malam Road, Package I - Betong Junction to Spaoh Junction, Betong Division (25km)
|
 |
Murum Dam Access Road, Kapit Division (66km)
|